- 21 ltr
- Complete boiler assembly
Boiler Spares, Parts
Compare
21 Ltr Boiler Complete S/S/J P/W
We stock replacement complete boiler assemblies
£775.00 Ex VAT
3/8f In 1/4f Out Std Gun (ART4334-02)
1 × £39.50
W3 Unloader Valve 11-15 LPM
3 × £79.50
Inline Fuel Filter Small
3 × £2.75
3/8F Brass Hose End
1 × £4.40
K3 Unloader Valve (1500 PSI)
2 × £75.00
Spray Gun C/W Qrc (20/021)
1 × £60.00
3/4F Y Inlet Water Filter
1 × £10.50
K1 Unloader 250 Bar 41lpm (K1)
1 × £75.00
Large Fuel Filter (P556245)
1 × £7.50
Chemical Pipe Plug
1 × £5.00
Eco Inlet Hose (Per Mtr)
2 × £1.30
3/8F Black Hose End
3 × £9.50
Brass Chemical Filter
2 × £3.50
G/Bowser Reel Bracket
1 × £95.00
Astra Wheel (New Type)
1 × £19.25
4500 PSI 40 LPM Unloader Valve
2 × £66.50
12m 3/8 Hose (Hot) 1 Wire TX
1 × £54.50
Castor Wheel Braked (Astra)
1 × £18.50
3/4 Banjo T Strainer
1 × £47.50
1/4 F Bung
2 × £1.37
Inline Fuel Filter Large
1 × £3.50
Unloader & Press Switch Complete
1 × £87.50
EL1212
1 × £1.95 Subtotal: £1,100.19
£775.00 Ex VAT
| Weight | 40 kg |
|---|---|
| Dimensions | 565 × 330 × 720 mm |
Select at least 2 products
to compare
